 |
|
 |
 |
| |
RIVERWALK CENTER
Primary design objectives for the Breckenridge Riverwalk Center
were to replace the deteriorating fifteen-year-old, 780-seat performance
tent with a more durable structure in order to reduce yearly setup
costs, to extend the season for events beyond the short summer
at ten-thousand feet, and to improve the experience for the performers
and audience in a more comfortable environment with much better
acoustics. All this needed to happen at a minimum expense, with
minimum operating costs, and at the highest level of environmental
responsibility. And construction activity had to be completed between
the summer performance seasons. |
|
 |